In: PICMET’07-2007 Portland international conference on management of engineering and technology. J Optim Theory Appl 105(2):299–323Ĭhan KY, Pretorius MW (2007a) Developing technological capability in science parks: a networking model approach. Int J Comput Integr Manuf 24(9):821–833Ĭhaldi O, Chbani Z, Riahi H (2000) Equilibrium problems with generalized monotone bifunctions and applications to variational inequalities. J Oper Res Soc 60:1–4Ĭhaari T, Chaabane S, Loukil T, Trentesaux D (2011) A genetic algorithm for robust hybrid flow shop scheduling. Int J Prod Res 49(13):3891–3918īrailsford S, Harper P, Shaw D (2009) Milestones in OR. Optimization 66(9):1495–1517īen Ali M, Sassi M, Gossa M, Harrath Y (2011) Simultaneous scheduling of production and maintenance tasks in the job shop. Addoune S, El Haffari M, Roubi A (2017) A proximal point algorithm for generalized fractional programs.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |